01/07/2020. Project is completed!
01/05/2020. Leslie visited and we finished setting all the plants today. We selected bases for our redwood bench too.
12/30/2020. There's lots of work on the project. The crew is trying to finish up by tomorrow.
12/18/2020 The two fountains were installed today.
12/18/2020 Mow-less grass installed. Slate finished & looks awesome.
12/4/2020. The pavers were finished today! Unfortunately, the wonderful company who installed them "Bay Area Interlocking Pavers" left without repairing the original pavers that have been badly broken during the construction & with heavy equipment running over them. I spoke with Alfredo and Jose Jr. about this & expected that they were going to do the repairs.
12/3/2020 Pavers: almost done!
12/3/2020 Pavers: almost done!
12/2/2020, The flagstone path & pavers are being installed
11/26/2020. Here is a set of updated pictures.
Future no mow grass area
Paver layout
11/24/2020. We did a walk through with Jose, Jr. and Jeff today. Things are coming together, but there is much to do!
11/20/2020. Leslie, our wonderful landscape architect visited today to place the plants. She determined that most parts of the yard that she looked at weren't finished enough to place the plants. She will contact Jeff, the owner of the landscape company, to coordinate another time. One great thing: I really wanted a stream bed with running water. Leslie determined that there were not enough rocks to make a rock wall. So, we are going to make a stream bed in the back. The pump will be placed on a mound and the water will run over rocks in the stream bed. I'm so excited about this. Also, there is one species of plants that I don't like and she is going to remove them. It was a great meeting.
11/19/2020. We worked with Jose Jr. to place the basins for the two water features.
11/17/2020 This was a big day. The pavers and the plants arrived!
![]() |
| Peninsula Building Materials very slick way with loader |
11/16/2020 The planter boxes arrived today on my Father's Birthday! They were built by a metal fabricator in Coursegold California (3 hours away)!
| Carefully getting them loaded & strapped in |
11/15/2020
![]() |
| From back of yard |
![]() |
| Behind blackberry bushes all cleared out |
11/13/2020 This is a sneak preview of the planter boxes
In progress of being manufactured. Wood will sit on top!
![]() |
| Ready to be rusted! |
11/11/2020. We worked quite a long time with the landscaping crew to reduce the size of the "no mow" grass. We positioned the antique hay rake to make sure we had it right. We are happy with the new layout.
11/06/2020 We ventured to Half Moon Bay today to Spanish Town to look at Boulders. We selected these. (Tall column on the bottom). They look great with water running in them. Together they weigh 1,000 pounds!
Backyard today: all concrete removed

Backyard today: all concrete removed
| Before |
| Before |
![]() |
| Front bank |
11/05/2020. We ventured to Pottery Planet to look at Boulders. We've tentatively selected this one. We liked the colors and the carvings on it.
10/29/2020. We ventured out to Peninsula Building Materials to pick up our paver samples. We selected this one: Grey Charcoal Tan
10/23/2020. Day3
10/22/2020. Day 2
![]() |
| Stream bed completely cleared |
![]() |
| Patio slope started |
![]() |
| Lavender probably will not recover |
![]() |
| Workers rest area. They even have a way to heat their food! |
![]() |
| All bricks, concrete blocks neatly stacked. |
![]() |
| More debris |
![]() |
| Old brick pathway demo'd |
![]() |
| Old brick pathway demo'd |
![]() |
| Rock collection pile |
![]() |
| Stream bed all river rock removed |
![]() |
| River rock from old stream bed |
![]() |
| Concrete block, steps, brick neatly stacked |
![]() |
| Debris staging area |
![]() |
| Stream bed before |
| Stream bed before |
![]() |
| Before |
10/20/2020. We walked through the yard with Jeff and his project leads. They will start tomorrow!
10/02/2020 Painting took 4 days!
09/07/2020: Fence power washing .... took two days!
![]() |
| Before |
![]() |
| After |
08/23/2020: tree trimming & removal project took 4 days. Pictures at this link: http://www.fototime.com/inv/A4D8E88AC8CBD79